Skip to content
Treasure Valley based, moving nationwideLicensed and insured, USDOT pending

Commercial moving in the Treasure Valley

Offices, schools and industrial space, moved outside business hours. A commercial move is judged on one thing: whether the building works on the first morning back.

What shape is the job?

Commercial work splits three ways, and each has a different planning horizon. Knowing which you have is the difference between a quote and a guess.

You are changing buildings

A one-off move

The whole operation goes from one address to another, usually over a single weekend, with a labelling plan built weeks earlier.

Priced on
Per project
Lead time
6 to 8 weeks
Runs
Friday evening to Sunday
Staff pack
Reusable crates
Furniture
Dismantled and rebuilt
Downtime
Planned at zero working days
See office moving
You are staying put

Ongoing changes

Desks, teams and departments shifted inside a building you already occupy. Recurring work on a standing account rather than a new quote each time.

Priced on
Agreed standing rates
Lead time
Days
Runs
Evenings and weekends
Minimum
None
Furniture
Systems reconfigured
Crates
Held on site for you
See move, add, change
You are handing it back

Clearing a space

End of lease clearance: furniture out, assets resold or donated, data destroyed, and the space handed back in the condition the lease describes.

Priced on
Per project, net of resale
Lead time
4 to 6 weeks
Runs
Building hours permitting
Assets
Resold, donated, recycled
Data
Destroyed with certificates
Handover
Broom clean, photographed
See decommissioning

Crew sizes, trucks and lead times describe what we plan for. Your estimate carries the numbers for your move.

A protected blue floor route taped across a polished stone lobby, running from the entrance doors into the building

Taped and edged route from the entrance, laid before a single item moves

The building is the client too

Landlords remember the mover who marked a lobby floor. Site protection goes in before anything moves, at both ends, and the certificates of insurance are with both building managers before the day.

  • Taped route from the dock to the lift, at both addresses
  • Lift interiors padded and thresholds plated
  • Certificates of insurance to both landlords in advance
  • A crew lead on site who owns the building relationship

How a commercial job runs

Survey both sites

Headcount, furniture, lift sizes, dock access and the building rules at each end.

Agree the plan

A numbered floor plan and a labelling scheme, signed off before anything is ordered.

Crates go out early

Delivered a week ahead so staff pack their own desks during the working week.

Move out of hours

Evening and weekend, then rebuilt and reconnected before the first morning back.

Commercial moving questions

Six to eight weeks for a full office move over about 30 people, four to six for a decommission, and days for move, add, change work on a standing account. The move is a weekend; the planning is what needs the runway.

The plan is built so you do not. Staff pack crates during the week, the move runs Friday evening through the weekend, and the furniture is rebuilt and reconnected before Monday.

Yes, and we send certificates to both building managers before the date rather than being asked for them at the dock. Tell us the requirement on the quote form and we will meet it.

Standard workstations, monitors, docks and phones: disconnected, moved and reconnected. Servers and network racks belong with your IT provider, and we schedule around them.

Yes, and that is what move, add, change is for. Rates are agreed once, then each internal move is a request rather than a procurement exercise.